Home |News |Glossary |Site Map | Hebrew
2013
Contact
Name:
Please fill name field
E-mail:
Phone:
Message:
Please enter the numbers: Please enter the numbers
Please enter the correct digits
Your message was sent successfully
 

New Control Project: Upgrading Electric Systems in Barzilai Hospital

1 January, 2013

As part of the general upgrade to the electric infrastructure at Barzilai Hospital, Alutech was chose to monitor and Control System and integrate the database in an HMI system.